Friday, July 04, 2008

Google

Pics from Thursday 7/3






New pics are here. We met with the kitchen designer this morning. We're having to incorporate a small change to the line setup so that the griddle and grill a placed within the inspectors guidelines for the vent system. It basically just meant that we swapped the location for the griddle and grill with the pannini press and gyro machine. No big deal. We also met with the electrician to finalize the plans for the wiring of the POS system, bar lighting, and kitchen equipment that requires a dedicated circuit. We also purchased the wine glasses and some other odds and ends to start the dish and small ware process. The rest of the dishware was ordered and hopefully we'll be able to pick that up early next week. As you can see also the railing for the deck was completed. In the corner of one of the pictures is our other generous benefactor Pete Petrakis inspecting the integrity of the craftsmanship. Proceed. I also got another picture of the inside of the restroom and office area that is enclosed in the encapsulated area behind the deck. More inspections next week...still apparently on schedule.

4 Comments:

Blogger Laura said...

The suspense is almost too much! Isn't this the most exciting thing ever! Congratulations!!

Hugs & XOXO!

8:13 AM  
Blogger Laura said...

The suspense is almost too much! Isn't this the most exciting thing ever! Congratulations!!

Hugs & XOXO!

8:13 AM  
Blogger Cryptoseeker said...

CONGRATULATIONS Kris !!!!!!!!!

Charles,The Boys & I wish you all the best and we cant wait for you to open so we can chow down on your FABULOUS cooking !!!!!!

Much love to you & Steph .....
Carolann & Family :)

11:04 AM  
Blogger Chef KP said...

Thanks for everyone's support. It's been quite a process. I look forward to opening up and putting some food out.

See you soon. KP

7:05 AM  

Post a Comment

<< Home